CLIENT

Fisher Brothers

LOCATION

605 3 rd Avenue, New York, NY

Motor Control Center Replacements

Developed Contract Documents and Prepurchase specifications for the replacement of
six (6) original MCC’s located throughout the building’s mechanical rooms. Each MCC
was original to the building installation and at 50 years old, beyond repair and useful life.
P&A provided individual method of procedures for each MCC to minimize downtime. The
Project is part of a long-term master plan with several MCC’s to be replaced over several
years.

Related Projects